TeroSmartHub™
Home

TeroSmartHub™ · Homeowner learning

My Home Handover Guide

Start with one small action: ask your builder or seller for the latest document list. You can register and use TeroSmartHub even when drawings or other handover records are missing.

Last updated: 24 October 2026

Your personal handover checklist

Optional. Save one item at a time for a property you can access. Answers belong to your signed-in account and this property; they are not shared approval or evidence of verification. Missing records do not block registration or normal use.

Save before changing items or properties. Linked-file availability below confirms whether a stored document can be retrieved. Verified requires authorised professional review and remains unavailable.

Loading checklist access…

From planning to caring for your home

  1. 1. Planning
  2. 2. Construction
  3. 3. Testing
  4. 4. Handover
  5. 5. Occupation
  6. 6. Maintenance
  7. 7. Asset Renewal

At handover, collect the available records. During occupation, retain updates, service evidence and changes. When equipment is renewed, keep the replacement information with its history.

A guide you can read at your own pace

Read any category below, or use the optional personal checklist after signing in. Checklist answers do not verify documents. Handover files can be uploaded and linked without changing facility setup. Generate a controlled checklist or missing-document request PDF through the existing Output Studio workflow. Professional verification remains separate.

Keep private documents in your authorised workspace using its existing document tools where available to your role. Select the correct property, system or asset and check the current upload instructions and access permissions. Document links are saved only when you explicitly select and link a stored file.

a · Property and statutory records

Why do I need these records?

Understand the property's recorded ownership, boundaries and approval history. Requirements vary by location and building type; ask the relevant local authority and a qualified adviser which records apply to your home.

What are they?

Ownership and survey records
Title or other applicable ownership records describe the recorded interest in the property. A survey identifies boundaries and site information. They help advisers check what you are taking over.
Planning approvals and approved drawings
These record what the relevant authority approved. Keep the approval conditions and drawing revisions so changes can be checked against that history.
Inspection, completion and statutory certificates
These record applicable official inspections or completion processes. Check the issuer, property reference and scope; a certificate does not replace every other required check.

Who should provide them?

The seller or owner, surveyor, project team and relevant issuing authority. Ask a qualified local property adviser to review ownership and approval questions.

Have I received them?

Compare each item above with the copies you have. Check the property or equipment reference, date, revision and legibility. Use the optional personal checklist above to save a request or review status; it does not verify the document.

Where do I upload them?

Use the existing document tools in your authorised workspace where supported, keeping each record with the relevant property, system or asset. The personal checklist can link a document already stored for this property. Keep an original copy securely.

Have they been verified?

Receiving or uploading a file does not verify its authenticity, completeness, technical adequacy or present safety. Ask the issuing authority or appropriately qualified professional to review what is relevant, and retain their review evidence.

What if I cannot obtain them?

Ask the seller or project team for copies and the issuing authority about its retrieval process. Do not assume that an absent record was issued or that a building is compliant.

Back to guide overview
b · Architectural drawings

Why do I need these records?

Understand the layout and finishes before future alterations or repairs. As-built drawings show how the home was actually constructed, including recorded changes, rather than only the original design intent.

What are they?

Final as-built plans, elevations and sections
Floor plans show room layouts, elevations show outside faces, and sections show vertical slices through the building. They help future teams understand spaces and levels.
Roof plans and opening schedules
Roof plans describe the roof layout. Door and window schedules identify opening types and details, helping with replacement, repairs and consistent specifications.
Finishes schedules and approved revisions
Finishes schedules identify materials and surface treatments. Final revisions explain changes, helping you avoid relying on an outdated drawing.

Who should provide them?

The architect or responsible designer, with the contractor's final construction information and revision history.

Have I received them?

Compare each item above with the copies you have. Check the property or equipment reference, date, revision and legibility. Use the optional personal checklist above to save a request or review status; it does not verify the document.

Where do I upload them?

Use the existing document tools in your authorised workspace where supported, keeping each record with the relevant property, system or asset. The personal checklist can link a document already stored for this property. Keep an original copy securely.

Have they been verified?

Receiving or uploading a file does not verify its authenticity, completeness, technical adequacy or present safety. Ask the issuing authority or appropriately qualified professional to review what is relevant, and retain their review evidence.

What if I cannot obtain them?

Request the latest issued set and its revision list. If it is unavailable, ask an appropriate professional about a measured record; do not label an unverified sketch as an as-built drawing.

Back to guide overview
c · Structural documents

Why do I need these records?

Give a qualified engineer evidence to assess future loading, alterations or concerns. These records are not a self-service confirmation that a structure is safe.

What are they?

Structural as-builts and foundation information
These describe recorded foundations, framing and structural elements. They help engineers understand concealed construction before proposed work.
Tests, inspections and engineer sign-off
Relevant test results, inspection records and signed engineering documents describe what was checked and when. Keep their limitations and references together.
Modifications and structural history
Records of openings, extensions, repairs or other changes help an engineer understand how the original structure may have been altered.

Who should provide them?

The responsible structural engineer, contractor and testing or inspection organisations, according to their work scope.

Have I received them?

Compare each item above with the copies you have. Check the property or equipment reference, date, revision and legibility. Use the optional personal checklist above to save a request or review status; it does not verify the document.

Where do I upload them?

Use the existing document tools in your authorised workspace where supported, keeping each record with the relevant property, system or asset. The personal checklist can link a document already stored for this property. Keep an original copy securely.

Have they been verified?

Receiving or uploading a file does not verify its authenticity, completeness, technical adequacy or present safety. Ask the issuing authority or appropriately qualified professional to review what is relevant, and retain their review evidence.

What if I cannot obtain them?

Ask the responsible engineer for the available records and advice on any further assessment. Tero Guide and AI cannot certify structural safety. Refer suspected structural danger to a qualified professional promptly.

Back to guide overview
d · Electrical documentation

Why do I need these records?

Help qualified electricians identify circuits, supplies and protection before inspection or maintenance. Do not open live panels, test wiring or attempt electrical work using this guide.

What are they?

Electrical as-builts, single-line diagrams and distribution schedules
These show recorded circuit routes, how supplies connect, and which circuits each board serves. They support safe identification and future fault investigation.
Protection, earthing and testing records
These describe installed protective arrangements and recorded tests. They help a qualified electrician evaluate the system; they do not prove its present condition indefinitely.
Generator, solar/inverter and lighting documentation
Connection diagrams, switching information and lighting schedules describe equipment interfaces and fittings. Multiple power sources need specialist attention even when one supply is off.

Who should provide them?

The electrical designer, licensed or otherwise appropriately qualified electrical contractor, installer and testing specialist.

Have I received them?

Compare each item above with the copies you have. Check the property or equipment reference, date, revision and legibility. Use the optional personal checklist above to save a request or review status; it does not verify the document.

Where do I upload them?

Use the existing document tools in your authorised workspace where supported, keeping each record with the relevant property, system or asset. The personal checklist can link a document already stored for this property. Keep an original copy securely.

Have they been verified?

Receiving or uploading a file does not verify its authenticity, completeness, technical adequacy or present safety. Ask the issuing authority or appropriately qualified professional to review what is relevant, and retain their review evidence.

What if I cannot obtain them?

Request records from the installer and arrange a qualified assessment where needed. Do not guess circuit identities or operate unfamiliar switching equipment. Keep sensitive supply details private.

Back to guide overview
e · Plumbing, water and drainage

Why do I need these records?

Understand recorded water and drainage systems so competent providers can locate equipment and plan repairs without unnecessary damage.

What are they?

Water supply and hot-water drawings
These show recorded pipe routes, valves and hot-water equipment. They help providers find isolation points and understand how the system is arranged.
Soil, wastewater and drainage layouts
These show recorded waste routes, inspection chambers and drainage details. They help specialists investigate blockages and maintain access points.
Boreholes, pumps, tanks and treatment records
Equipment information and commissioning records explain installed capacity, settings and initial checks. They help plan servicing and appropriate water-quality assessment.

Who should provide them?

The plumbing or building-services designer, contractor, borehole/pump/treatment installer and commissioning provider.

Have I received them?

Compare each item above with the copies you have. Check the property or equipment reference, date, revision and legibility. Use the optional personal checklist above to save a request or review status; it does not verify the document.

Where do I upload them?

Use the existing document tools in your authorised workspace where supported, keeping each record with the relevant property, system or asset. The personal checklist can link a document already stored for this property. Keep an original copy securely.

Have they been verified?

Receiving or uploading a file does not verify its authenticity, completeness, technical adequacy or present safety. Ask the issuing authority or appropriately qualified professional to review what is relevant, and retain their review evidence.

What if I cannot obtain them?

Request installer information and ask a competent provider to identify and record the system. Do not enter tanks or inspection chambers, or assume water is safe because equipment was commissioned.

Back to guide overview
f · Mechanical equipment

Why do I need these records?

Know what equipment you own and find the correct operating and maintenance instructions.

What are they?

AC manuals and equipment schedules
Manuals explain the specific equipment's use. Schedules list installed units, models, serial numbers and locations so you can request the right service or part.
Installation, ventilation and commissioning records
These describe how equipment was installed and initially checked, including relevant ventilation information. They provide a baseline for later investigation.
Recommended maintenance
Manufacturer or competent-provider instructions describe suitable servicing and checks. Use the actual model and operating conditions when planning maintenance, rather than assuming one interval fits everything.

Who should provide them?

The mechanical contractor, AC/ventilation installer, equipment supplier and commissioning engineer.

Have I received them?

Compare each item above with the copies you have. Check the property or equipment reference, date, revision and legibility. Use the optional personal checklist above to save a request or review status; it does not verify the document.

Where do I upload them?

Use the existing document tools in your authorised workspace where supported, keeping each record with the relevant property, system or asset. The personal checklist can link a document already stored for this property. Keep an original copy securely.

Have they been verified?

Receiving or uploading a file does not verify its authenticity, completeness, technical adequacy or present safety. Ask the issuing authority or appropriately qualified professional to review what is relevant, and retain their review evidence.

What if I cannot obtain them?

Use the equipment label to request the correct manual from the manufacturer or installer. Have a qualified technician confirm uncertain identification; do not remove covers or handle refrigerants yourself.

Back to guide overview
g · Security, fire and safety

Why do I need these records?

Keep authorised users informed about safe operation and emergency arrangements while protecting confidential security information.

What are they?

CCTV, access-control and alarm records
Manuals and restricted camera-location or device records describe installed systems. Store them privately with access limited to people who need them.
Fire detection and protection evidence
System information, commissioning and service evidence show what equipment was installed and checked. Ask the responsible professional which ongoing checks apply.
Emergency information
Agreed emergency contacts, safe-use instructions and evacuation information help occupants respond appropriately. Keep details current and make necessary instructions available to occupants.

Who should provide them?

The security and fire-system installers, responsible safety professional, manufacturer and authorised property representative.

Have I received them?

Compare each item above with the copies you have. Check the property or equipment reference, date, revision and legibility. Use the optional personal checklist above to save a request or review status; it does not verify the document.

Where do I upload them?

Use the existing document tools in your authorised workspace where supported, keeping each record with the relevant property, system or asset. The personal checklist can link a document already stored for this property. Keep an original copy securely.

Have they been verified?

Receiving or uploading a file does not verify its authenticity, completeness, technical adequacy or present safety. Ask the issuing authority or appropriately qualified professional to review what is relevant, and retain their review evidence.

What if I cannot obtain them?

Arrange a handover with the authorised installer and responsible safety professional. Do not put passwords, alarm codes, access credentials or security-system layouts on a public page or in an AI conversation.

Back to guide overview
h · Generators, power and energy

Why do I need these records?

Give competent technicians the correct information for installed power equipment, its fuel arrangements and maintenance.

What are they?

Generator manuals, commissioning and ATS records
Manuals and test records describe the installed generator. An ATS (automatic transfer switch) manages supply switching; its documentation helps qualified technicians understand that arrangement.
Fuel systems and warranties
Recorded fuel-system details support safe professional servicing. Warranty terms explain coverage and conditions, including any required service evidence.
Solar, inverter and battery information
Model-specific manuals, installation records and maintenance recommendations describe the installed energy system and its limitations. Retain supplier instructions for servicing and replacement.

Who should provide them?

The generator supplier, power-system designer, qualified installer and solar/inverter/battery supplier.

Have I received them?

Compare each item above with the copies you have. Check the property or equipment reference, date, revision and legibility. Use the optional personal checklist above to save a request or review status; it does not verify the document.

Where do I upload them?

Use the existing document tools in your authorised workspace where supported, keeping each record with the relevant property, system or asset. The personal checklist can link a document already stored for this property. Keep an original copy securely.

Have they been verified?

Receiving or uploading a file does not verify its authenticity, completeness, technical adequacy or present safety. Ask the issuing authority or appropriately qualified professional to review what is relevant, and retain their review evidence.

What if I cannot obtain them?

Ask the original suppliers or a qualified specialist for records and a safe handover. Do not run generators in enclosed spaces, improvise fuel connections or attempt power-system switching from this guide.

Back to guide overview
i · Warranties and service providers

Why do I need these records?

Find support quickly and retain evidence needed for warranty or contractual enquiries.

What are they?

Warranty certificates and purchase evidence
Certificates, receipts and installation dates identify the product and relevant terms. Record stated expiry dates and conditions accurately; do not assume all cover starts on handover day.
Installer details and maintenance agreements
Contact details, supplier support records and service agreements explain whom to contact and what work is covered. Keep an accessible copy of agreed terms.
Spare parts and defects-liability records
Recommended part references help suppliers identify suitable replacements. Contractual defects-liability obligations record agreed responsibilities and periods; they are separate from a general assumption of warranty cover.

Who should provide them?

The seller, builder, suppliers, installers and contracted service providers. Ask an appropriate adviser about disputed contractual obligations.

Have I received them?

Compare each item above with the copies you have. Check the property or equipment reference, date, revision and legibility. Use the optional personal checklist above to save a request or review status; it does not verify the document.

Where do I upload them?

Use the existing document tools in your authorised workspace where supported, keeping each record with the relevant property, system or asset. The personal checklist can link a document already stored for this property. Keep an original copy securely.

Have they been verified?

Receiving or uploading a file does not verify its authenticity, completeness, technical adequacy or present safety. Ask the issuing authority or appropriately qualified professional to review what is relevant, and retain their review evidence.

What if I cannot obtain them?

Ask for duplicates and written confirmation of terms from the responsible supplier or contractor. Do not invent an expiry date or promise a claim will be accepted.

Back to guide overview
j · Final inspection and acceptance

Why do I need these records?

Keep a clear record of what was handed over, what still needs attention and who is responsible for the next action.

What are they?

Snag lists and corrective-action evidence
A snag list records defects or incomplete work. Keep locations, agreed responsibilities, outstanding items and evidence of corrections so closure can be reviewed.
Final commissioning and user demonstrations
Final checks and practical demonstrations explain how installed systems should be operated. Ask questions and retain the specific instructions supplied.
Access-device transfer and final acceptance
A controlled record of keys, remotes and access devices helps account for the handover. Acceptance records should state any remaining conditions; do not sign away unresolved matters without understanding the terms.

Who should provide them?

The homeowner or authorised representative, contractor, relevant consultants and equipment installers.

Have I received them?

Compare each item above with the copies you have. Check the property or equipment reference, date, revision and legibility. Use the optional personal checklist above to save a request or review status; it does not verify the document.

Where do I upload them?

Use the existing document tools in your authorised workspace where supported, keeping each record with the relevant property, system or asset. The personal checklist can link a document already stored for this property. Keep an original copy securely.

Have they been verified?

Receiving or uploading a file does not verify its authenticity, completeness, technical adequacy or present safety. Ask the issuing authority or appropriately qualified professional to review what is relevant, and retain their review evidence.

What if I cannot obtain them?

Request a joint handover review and record outstanding actions in writing. Ask the appropriate professional to assess unresolved concerns; uploading a photo is not proof that a defect is corrected.

Back to guide overview

Understand document status

These definitions explain the intended checklist journey. Your saved answers appear only in the personal checklist above. Uploaded availability is shown with the linked file after retrieval is checked. Verified remains unavailable until authorised review is connected.

Not received
You do not yet have the record.
Requested
You have asked the responsible provider for it.
Uploaded
The file has actually been stored and can be retrieved; this does not mean verified.
Needs review
The record needs an appropriate person's assessment or clarification.
Verified
An authorised, appropriately qualified reviewer has checked the relevant scope and retained evidence. Upload alone cannot establish this.
Not applicable
The item does not apply to this property or system; record the reason when a checklist is available.

Choose your first small step

Request one missing record from the responsible person, or organise one copy you already have. Missing records do not block using TeroSmartHub.

Home · Create Free Account or Sign In
TeroSmartHandover guide